Solar collector panel plonk /1
Envirosun AS Split System Solar Hot Water Systems
Envirosun Installer does
- Install, connect and secure Envirosun solar collector panels to the roof of the premises, in a confirmed location as per Envirosun specifications
- Connect and secure the Envirosun solar panel sensor to the hot outlet of solar collector. Leave sensor lead bundled and taped on roof
- Blow off / Clean roof area
- Remove all rubbish from site
Required to be completed by others
- Run all copper flow and return lines from the Envirosun solar panels on the roof to the storage tank location
- All penetrations to roof
- Run sensor cable (previously connected to solar panels) to the storage tank location with the flow pipe
- Final fit out of storage tank
- Connect solar pump to storage tank
- Connect sensor to pumping module
- All plumbing and electrical as per Envirosun specifications and regulations
NOTE/- Your plumbing contractor will have to get on the roof for this installation, under no circumstances is the solar hot water panels to be pressurised during plumbing roughin test